Page 11 - MEOG Week 15 2021
P. 11

MEOG                                  PROJECTS & COMPANIES                                            MEOG




































       TPAO drills new well at Sakarya





        TURKEY           TURKEY’S energy and natural resources min-  in the East Mediterranean where it has been
                         ister Fatih Dönmez said last week that Turkish  drilling in areas claimed by Cyprus, a campaign
                         Petroleum Corp. (TPAO) has kicked off drill-  that saw the European Union impose sanctions
                         ing the Amasra-1 well in the Sakarya gas field,  on vice-president Mehmet Ferruh Akalin and
                         located in the Turkish sector of the Black Sea.  exploration deputy director Ali Coscun Namo-
                           The well is being drilled by TPAO’s first drill-  glu in early 2020. The company is also under-
                         ship Fatih, which made the 320bn cubic metre  stood to be in advanced stages of a deal with
                         Tuna-1 gas discovery in August last year. This  Norway’s Dolphin Drilling to purchase a fourth
                         was subsequently upgraded to 405 bcm two  drillship, identified as Bolette, though with no
                         months later and the field was named Sakarya.  news on the deal since early February there
                           Amasra-1 is one of a 10-well drilling cam-  may be some truth to speculation in Norwegian
                         paign designed to achieve first gas in 2023 at a  financial press that the sanctions could compli-
                         rate of 3.65 bcm and a further 30 wells will be  cate proceedings.
                         drilled to achieve a plateau of 15 bcm per year   Fatih, Kanuni and the new vessel are ear-
                         by 2025.                             marked to carry out  the Sakarya  drilling
                           Last week, the company’s general manager  campaign.
                         Melih Han Bilgin told the Turkish parliament   The port on the country’s Zonguldak coast
                         that the wells would be drilled taking a ‘step by  will be connected to the field via a dedicated 150-
                         step’ approach.                      km subsea pipeline, with the production phase
                           Fatih completed the drilling of the Türkali-1  managed via subsea tieback.™
                         and Türkali-2 appraisal wells during Q1 and
                         TPAO will soon begin a well testing process at
                         both locations.
                           Han Bilgin said: “We are starting the test-
                         ing process mid-next month. The second and
                         third detection wells were drilled together
                         with the seismic interpretations we made in
                         the 2,200-square km 3-D seismic area.” He said
                         previously that test results should be received in
                         June. The next well, Sakarya’s fourth, will be an
                         exploration well.
                           The drillship will soon be joined by the Kan-
                         uni vessel, which it acquired in April 2020, fol-
                         lowing the completion of maintenance which is
                         being carried out at the Port of Filyos.
                           TPAO also owns the Yavuz, which remains




       Week 15   14•April•2021                  www. NEWSBASE .com                                             P11
   6   7   8   9   10   11   12   13   14   15   16