Page 9 - MEOG Week 02 2021
P. 9

MEOG                                  PROJECTS & COMPANIES                                            MEOG


       Iran finalises deals with local firms





        IRAN             IRAN’S Minister of Petroleum Bijan Zangeneh  1958, holding 63bn barrels of oil in place and is
                         this week oversaw the signing of eight deals  operated by NIOC subsidiary Karoun Oil and
                         between the National Iranian Oil Co. (NIOC)  Gas Production Co. (KOGPC).
                         and local companies to maintain and increase   A consortium of the National Iranian Drill-
                         production levels for seven southern oilfields  ing Co. (NIDC) and Jahanpars Engineering &
                         and one offshore asset.              Construction Co. was a repeat winner, adding a
                           As reported by  Middle East Oil & Gas  job on the Lali Bangestan field to the contract for
                         (MEOG) last week, the $1.2bn worth of deals  the Balaroud oilfield they won in August.
                         cover the offshore Reshadat oilfield as well as   Khatam-al Anbiya Construction Headquar-
                         others located in the Bushehr, Fars, Khuzestan,  ters (KAA), the engineering arm of the hard-line
                         Kohgiluyeh-Boyer Ahmad and Hormozgan  Islamic Revolutionary Guard Corps (IRGC),
                         provinces.                           was awarded by far the largest contract covering
                           Deals were signed on behalf of NIOC by  work on the second, third and fifth phases of
                         subsidiaries National Iranian South Oil Co.  Ahvaz as well as the offshore Reshadat.
                         (NISOC) and Iranian Offshore Oil Co. (IOOC)   Meanwhile, Mashin Sazi Arak in which KAA
                         and follow a larger raft of 13 contracts awarded  is known to hold shares was awarded a deal for
                         in August last year worth an estimated $1.78bn  the Bibi Hakimeh oilfield which has around
                         targeting a production increase of 185,000 bar-  500mn barrels of oil remaining.
                         rels per day.                          While these contract awards to local compa-
                           The announcement comes as part of a nation-  nies should come as little surprise to Iran watch-
                         wide effort to increase production by 355,000  ers given Tehran propensity for pushing forward
                         bpd at a total of 33 fields. Under this umbrella  with the development of domestic assets without
                         initiative a total of 22 engineering, procurement  the help of foreign firms prohibited from enter-
                         and construction (EPC) firms have agreed deals  ing the Iranian market by US-led sanctions, they
                         for the 33 assets with two yet to be signed.  are perhaps more noteworthy because of the
                           Some of the same companies picked up  clear expanding influence of the KAA.
                         contracts in both sets of awards, with the latest   While the group holds interests in various
                         round of contracts focusing mainly on smaller  assets such as the supergiant South Pars gas field
                         assets than those handed out in August.  and Marun oilfield through its reported 812 affil-
                           A contract for the Golkhari oilfield was  iates and subsidiaries including the high profile
                         awarded to North Drilling Co. (Sina Energy Gos-  MAPNA Group, Oil Industries Engineering
                         tar Holding), which is owned by the Bonyad-e  and Construction (OIEC), Iran Marine Indus-
                         Mostazafan Foundation, a religious endowment  trial Co. (SADRA), Persia Oil and Gas Industry
                         for war veterans and the poor. Both fall under the  Development Co. (POGIDC), Tadbir Energy
                         Execution of Imam Khomeini’s Order (EIKO).  Development Co. and Mashin Sazi, this week’s
                           A deal for the third and fourth phases of the  contract award appears to be the first directly
                         1.1bn barrel Gachsaran oilfield was agreed with  awarded to KAAC for several years.
                         the Iranian Offshore Engineering and Construc-  Tehran has been outspoken in its efforts to
                         tion Co. (IOEC) which previously picked up a  encourage the incoming administration of Joe
                         job on the third phase of the Maroun oilfield.  Biden in the US to remove sanctions, however,
                           Meanwhile, PetroIran Development Co.  even if strictures are lifted, the KAA’s wide and
                         (PEDCO) was awarded work on the Binak oil-  complex web of operations is likely to make it
                         field, following the August award of a job on the  difficult for IOCs to work on many of Iran’s most
                         3.7bn barrel Mansourabad oilfield.   attractive oil and gas assets. KAA has been on
                           Work on the Solabdar field was apportioned  the US Department of Treasury’s Office of For-
                         to a consortium of Qeshm Oil and Energy Indus-  eign Assets Control’s (OFAC) list of Specially
                         tries and Maroun Karan, which also jointly won  Designated Nationals (SDN) since 2007 for
                         a contract for projects 1 and 4 at the supergiant  helping “the IRGC generate income and fund its
                         Ahvaz field in August. Ahvaz was discovered in  operations”.™




















       Week 02   13•January•2021                www. NEWSBASE .com                                              P9
   4   5   6   7   8   9   10   11   12   13   14