Page 17 - GLNG Week 36
P. 17

GLNG                                        NEWS IN BRIEF                                             GLNG








                                                                                (see photo). Transportation to the yard has
                                                                                required detailed logistics planning. The tanks
                                                                                were moved by barge to Shanghai, where they
                                                                                were loaded on board the heavy-lift vessel, the
                                                                                ‘BBC Louise’ for transport to the USA. After
                                                                                crossing the Pacific, the ship will pass through
                                                                                the Panama Canal and then head north along
                                                                                the USA’s eastern seaboard on its way via the
                                                                                St. Lawrence Seaway to the shipyard on Lake
                                                                                Michigan. The ship is expected to arrive in
                                                                                late October as planned, which is in line with
                                                                                the yard’s schedule for delivering the barge to
                                                                                PNE end-2021.
                                                                                  “Delivering the cargo tanks as agreed with
                                                                                FBS puts the main piece of the jigsaw puzzle
                                                                                in place. Construction work has been to the
                                                                                highest HSE standards, and we are really
                                                                                satisfied with the quality,” says Geir Kirkemo,
       AMERICAS                               GAC Group, a global provider of   project manager for Wärtsilä Gas Solutions.
                                           integrated shipping, logistics and marine   The four cargo tanks are each 1350 m3 in
       Swedish-flagged tanker              services with Swedish heritage, assisted all   size. The Polaris New Energy barge will be
                                           parties by broking the LNG fuel and providing  the largest vessel of its kind when launched,
       FURE VEN becomes the                ship agency services to the vessel during her   and will operate as a ‘moving gas station’ to
                                                                                supply LNG-fuelled vessels along the East
                                           voyage across the Atlantic Ocean. This is the
       first foreign flagged vessel        first time in its history that GAC’s Bunker   Coast of the USA. The LNG will be delivered
                                                                                at a temperature of approximately minus 160
                                           Fuels division has secured a deal to supply
       to bunker LNG at a United           LNG as a marine fuel.                degrees C.
                                              FURE VEN is one of Furetank’s V-Series,
                                                                                WÄRTSILÄ GAS SOLUTIONS, September 08,
       States port with Eagle LNG          a new generation of product & chemical   2020
                                           tankers introduced in 2018, which leverage
       FURE VEN, a dual-fuelled vessel owned and   innovative design features and LNG to deliver
       operated by Furetank of Donsö, Sweden, a   a fuel reduction of approximately 40%. These   ASIA
       global leader in the development of efficient   climate smart vessels have also achieved
       and environmentally friendly product and   substantial reductions in emissions – 55% less   Delta Offshore Energy
       chemical tankers, has become the first non-  CO2, 86% less NOx, 99% less SOx and 99%
       U.S. flagged vessel to bunker LNG in the   less particulate matter (PM) – compared to   launches RFP for 25-year
       United States with LNG sourced by Eagle   vessels of the same size, of earlier designs.
       LNG. Eagle LNG Partners, a pioneer in small-  FURETANK, September 08, 2020  LNG agreement
       scale LNG and an LNG bunker supplier, is
       the first company to deliver LNG bunker fuel   Major milestone achieved   Delta Offshore Energy launches Request
       to a foreign flagged vessel. This milestone                              for Proposal (RFP), first one of its kind for
       paves the way for more internationally   – delivery of tanks for         Vietnam, for 25 years gas sales agreement.
       trading vessels to bunker at Jacksonville                                  Delta Offshore Energy RFP the Tender
       Port Authority (JAXPORT), marking the   Wärtsilä supplied cargo          is for delivery of 2.5-3.0 MTPA (million
       latest tangible demonstration of LNG as a                                tonnes per annum) Cargoes over a 25 year
       safe and reliable fuel solution. It also builds   handling system        period, on a delivery ex-ship (DES) or freight
       confidence in the case for LNG to help the                               on board (FOB) basis to the offshore LNG
       shipping industry meet increasingly stringent   Wärtsilä Gas Solutions took delivery on   (liquid natural gas) regas facility in Bac Lieu
       environmental regulations, while still   August 28 of four LNG cargo tanks from the   Province.
       generating substantial cost savings.  company’s supplier in China. The successful   It is worth stating that Delta Offshore
         On Tuesday, September 1, 2020, the 18,000   completion of this delivery will allow the   Energy’s 3.2-GW LNG to Power project
       DWT vessel transited the St. Johns River,   installation of a complete cargo handling   is fully approved by the Vietnamese
       calling at JAXPORT’s Talleyrand Marine   system to proceed on schedule. The system   Government with the inclusion in the national
       Terminal, which serves Crowley Maritime   is intended for a new 5400 m3 LNG bunker   Power Development Plan revision 7 and
       Corporation. Eagle LNG Partners safely   barge being built at the Fincantieri Bay   the issuance of the investment registration
       transferred 225 metric tonnes of LNG to the   Shipbuilding (FBS) yard in Wisconsin, USA   certificate in January 2020.
       vessel from their on-site storage facility, with   for Polaris New Energy, LLC (PNE).  The bidding will open from the 9th of
       the bunkering evolution taking less than   The four cargo tanks have internal piping,   September, 2020. Bidding closing on the 27th
       seven hours to complete. The tanker was   instruments, equipment and access structures.   of September, 2020.
       laden with renewable diesel cargo for Preem,   They also have 300mm insulation and will be   DELTA OFFSHORE ENERGY, September 08,
       the largest petroleum and biofuels company   installed below deck on the bunkering barge;   2020
       headquartered in Sweden.            only the domes will be visible once completed



       Week 36   11•September•2020              www. NEWSBASE .com                                             P17
   12   13   14   15   16   17   18   19