Page 14 - AsianOil Week 15 2022
P. 14

AsianOil                                     NEWS IN BRIEF                                           AsianOil

























       re-frack operation. We are pleased to have   will provide a license, basic engineering   use existing infrastructure to store CO2 in
       secured the equipment and services for the   and proprietary equipment to CPC for its   the depleted Bream field off the coast of
       important C-77H re-frack operation given the   proprietary ROSE technology. KBR will   Gippsland, Victoria. The company is in active
       worldwide shortage of fracking services. The   also supply the engineering package for the   discussions with local industries which may
       amended gas sales agreement is consistent   upstream VDU.                be interested in accessing the SEA CCS hub to
       with the recent government of India revised   ROSE technology is a cost-effective   reduce emissions from their operations.
       domestic gas price announcement.”   residue upgrading process that allows refiners   The project is designed to capture up to
       OILEX, April 14, 2022               to produce higher grade, cleaner products   2mn metric tons of CO2 per year. If technical
                                           while reducing the facility’s carbon footprint.   and business feasibility is confirmed, the SEA
                                           This industry leading technology delivers   CCS hub could be operational by 2025.
       EAST ASIA                           50% energy savings over conventional SDA   “Collaboration with other industries is
                                           technologies.                        an important step to unlock future carbon
       TMK Energy discovers                important project that enables clean fuels   capture and storage opportunities for
                                              “We are pleased to work with CPC on this
                                                                                Australia, with the potential for large-scale
       gassy coal in Mongolia              production with KBR’s energy-efficient and   reductions in the highest emitting industrial
                                           sustainable ROSE process,” said Doug Kelly,
                                                                                sectors,” said Joe Blommaert, president of
       Sydney-listed TMK Energy has discovered   KBR President, Technology. “KBR’s design   ExxonMobil Low Carbon Solutions. “Sound
       44 metres of gassy coal in the upper coalbed   features an innovative integration solution   government policies will accelerate the
       in the first well of its Snow Leopard – 1   between the VDU and ROSE unit, which   deployment of key technologies required
       programme, in the Nariin Sukhait area of   significantly reduces the project’s carbon   to support society’s ambition for a net-zero
       Mongolia’s Gurvantes XXXV CBM project,   footprint.                      future.”
       Natural Gas World has reported.        KBR is a global leader in residue upgrading   EXXONMOBIL, April 14, 2022
         Preliminary results are said to show that   technologies with the largest installed base
       the coalbed has a significant gas concentration   and has been involved in the licensing, design,   EnerMech secures five-
       and a high gas saturation.          engineering, and/or construction of 70 ROSE
         Talon Energy, TMK’s joint venture partner,   units worldwide with a combined licensed   year inspection and cranes
       is funding a drilling campaign via a $4.65mn   capacity of nearly 1.6 million BPSD. This list
       two-stage farm-out arrangement signed   includes operators that have installed multiple   maintenance contract with
       in February of last year. The current four-  ROSE units.
       well drilling and testing program has been   KBR, April 13, 2022         Inpex
       awarded $1.5mn in initial funding.
         The project is located approximately 20 km                             EnerMech has been awarded a five-year
       from the Chinese-Mongolian border, as well   OCEANIA                     onshore and offshore inspection services,
       as near the northern China gas transmission                              lifting equipment and crane maintenance
       and distribution network.           ExxonMobil begins design             contract by Inpex Operations Australia to
                                                                                support Inpex-operated Ichthys LNG.
                                           studies for South East                 Ichthys LNG is ranked amongst the
       KBR’s market-leading ROSE           Australia carbon capture             most significant energy developments in
                                                                                the world. The Ichthys Field is located about
       technology selected by CPC          hub in Gippsland                     220 kilometres offshore Western Australia
                                                                                and 820 km southwest of Darwin covering
       Corporation                         ExxonMobil said today it is undertaking early   an area of around 800 square km in water
                                                                                averaging depths of around 250 metres. Gas
       KBR announced today that it has been   front-end engineering design studies (pre-  and condensate from the Ichthys field are
       awarded a contract for its ROSE® supercritical   FEED) to determine the potential for carbon   exported to onshore facilities for processing
       Solvent De-Asphalting (SDA) technology   capture and storage to reduce greenhouse   near Darwin via an 890-km pipeline.
       and Vacuum Distillation Unit (VDU) from   gas emissions from multiple industries in the   Starting in May, EnerMech will project
       Taiwan’s state-owned oil company, CPC   Gippsland Basin.                 manage and deliver campaigns consisting of
       Corporation.                           The South East Australia carbon capture   the supply of lifting and rigging equipment,
         Under the terms of the contract, KBR   and storage (SEA CCS) hub would initially   testing, certification and the provision of



       P14                                      www. NEWSBASE .com                           Week 15   15•April•2022
   9   10   11   12   13   14   15   16   17