Page 19 - AfrOil Week 42
P. 19

AfrOil                                     NEWS IN BRIEF                                               AfrOil









       LNG
       Siemens Energy to help

       Total achieve low-emission
       goals for largest LNG

       project in Africa

       CCS JV (a joint venture between Saipem and
       McDermott) recently selected Siemens Energy
       to supply emissions-reducing power genera-
       tion equipment and boil-off gas compressors
       for the Mozambique LNG Project in the Cabo
       Delgado province on Africa’s East Coast. The
       project, led by TOTAL E&P Mozambique Area
       1, includes the development of offshore gas fields
       in Mozambique’s Area 1 and a liquefaction plant
       with a capacity in excess of 12 million tons per  Senior Vice President, Industrial Applications  companies like Pipe Coaters Nigeria and numer-
       year.                               Products for Siemens Energy.         ous Nigerian youths especially during the period
         As part of the contract, Siemens Energy will   The equipment order for the Mozambique  of the COVID-19 when most businesses and
       supply six SGT-800 industrial gas turbines that  LNG project comes on the heels of a recent  projects are shut down.
       will be used for low-emissions onsite power  agreement between Total and Siemens Energy   According to technical details of the pro-
       generation.                         to advance new concepts for low-emissions LNG  ject, the planned duration is five months and it
         With more than eight million total fleet oper-  production.            involves 12 inches X 28km Line pipes that would
       ating hours and more than 400 units sold, the   As part of the contract, Siemens Energy is  be coated with 3LPE, 5LPP and Concrete Weight
       SGT-800 turbine is ideally suited for power gen-  conducting studies to explore a variety of pos-  Coating (CWC). Additional services will include
       eration, particularly in LNG applications, where  sible liquefaction and power generation plant  Bends coating and Anodes installation and they
       reliability and efficiency are critical. The 54MW  designs, with the goal of decarbonizing LNG  are scheduled to be completed by November
       turbine rating selected for this project has a  facility development and operation.  2020.
       gross efficiency of 39 percent. It is equipped with   Siemens Energy, October 14 2020  This would be the first time in Africa that a
       a robust, dry low-emission (DLE) combustion                              facility would be applying CWC on top of a Ther-
       system that enables world-class emission perfor-                         mal Insulation (5LPE) coated line pipe.
       mance over a wide load range.       SERVICES                               The Executive Secretary who was repre-
         “Mozambique LNG is the country’s first                                 sented at the event by the General Manager
       onshore LNG development project and will play   NCDMB lauds Total E&P,    Projects Certification and Authorization Divi-
       a key role in meeting the increasing demand                              sion (PCAD), NCDMB, Engr. Paul Zuhumben
       for energy in the Asia-Pacific, Middle East, and   PCN on Ikike Line Pipe   lauded PCN for developing the capacity to exe-
       Indian sub-continent markets,” said Thorbjo-                             cute the job and showing that local companies
       ern Fors, Executive Vice President for Siemens   Coating Project         now have the capabilities to match their foreign
       Energy Industrial Applications. “We look for-                            counterparts in the delivery of oil and gas pro-
       ward to helping Total drive toward the lowest  The Nigerian Content Development and Moni-  jects to the highest quality and standards.
       possible plant emissions profile and contributing  toring Board (NCDMB) has commended Total   He noted that PCN had acquired experience
       to its goal of delivering clean, reliable energy to  Exploration and Production Nigeria (TEPNG)  that had spanned over two decades in Oil Coun-
       customers across the globe.”        and Pipe Coaters Nigeria (PCN) Limited for the  try Tubular Goods (OCTG) pipe management,
         Siemens Energy will also supply four centrif-  local content strides being recorded on the Total  pipe threading and line pipe coating for deep
       ugal compressors for boil-off gas (BOG) service.  Ikike Line Pipe Coating Project, which is ongo-  water applications.
       A key feature of these compressors is the inlet  ing at PCN facility in Onne Free Trade Zone,   The Executive Secretary also thanked Presi-
       guide vane (IGV) system that allows for opti-  River State.              dent Muhammadu Buhari and the Minister of
       mization of power consumption according to   The Executive Secretary of NCDMB, Engr.  State for Petroleum Resources, Chief Timipre
       changes in operational parameters such as inlet  Simbi Kesiye Wabote gave the commendation  Sylva for their commitment towards ensuring
       temperature and outlet pressure.    on Tuesday when he inspected the ongoing  that the Ikike project continued despite the lull
         The gas turbines are slated for delivery in the  project. He hailed Total E&P for embarking on  in the global business climate.
       second half of 2021 and the first half of 2022.  the Ikike project during the period of COVID-  In his comments, the Operations Senior
       The delivery of the compressors is scheduled for  19 pandemic, describing it as evidence that the  Manager of Tenaris/PCN, Mr. Ugochukwu Chi-
       2021.                               company believes in Nigerian Content develop-  jioke stated that the Ikike coating project would
         “We’re proud to be part of this important pro-  ment and the nation’s economy.  be executed by 100 percent Nigerians workforce
       ject as a supplier of reliable, field-proven rotating   He hinted that the Ikike Subsea, Risers &  and it offered the opportunity for the employ-
       equipment that will help contribute to the long-  Flowlines (SURF) Engineering Procurement  ment of over 300 direct personnel, training and
       term economic growth of Mozambique and  Construction and Installation (EPCI) pro-  the use of locally sourced materials, amongst
       the prosperity of its citizens,” said Arja Talakar,  ject will create huge opportunities for local  others.



       Week 42   21•October•2020                www. NEWSBASE .com                                             P19
   14   15   16   17   18   19   20   21   22