2.2 JOB SAFETY ANALYSIS (JSA)

                      For the safety reasons to these operations, we had a thorough toolbox meeting with Master,
                      Chief  engineer,  and  Chief  Officer  of  MT  Sinar  Mataram  regarding  safety  and  preparation
                      before we did underwater inspection. The following is the document for safety measures.






























































           PT SAMUDERA MBIANTU SESAMI                                           SALVAGE AND UNDERWATER WORK SERVICES
           Final Report Underwater Work of Rope/Net Removal from Bow Thruster and Propeller M/E       Page 9 of 49