Page 9 - FINAL REPORT SINAR MATARAM
P. 9
2.2 JOB SAFETY ANALYSIS (JSA)
For the safety reasons to these operations, we had a thorough toolbox meeting with Master,
Chief engineer, and Chief Officer of MT Sinar Mataram regarding safety and preparation
before we did underwater inspection. The following is the document for safety measures.
PT SAMUDERA MBIANTU SESAMI SALVAGE AND UNDERWATER WORK SERVICES
Final Report Underwater Work of Rope/Net Removal from Bow Thruster and Propeller M/E Page 9 of 49