Page 44 - Trainer Aid v3 _Neat
P. 44

gong is sounding, on the instructions
              from the OIC:


              As above AND
              •  Establish and charge mains feeder
              •  Open the inlet valve for the correct
                 system (usually yellow).
              •  Where a pressure gauge is fitted to
                 the inlet, pump as instructed. This
                 is usually “PUMP WHEN IN RED
                 SECTOR”. If there is no indication
                 or gauge, pump at no less than 700
                 kPa.
              •  Twin the delivery to the system
                 where two or more inlet couplings
                 are fitted.












                            FIXED INSTALLATIONS
   39   40   41   42   43   44   45   46   47   48   49