Page 132 - Barrow Town Deal Board Agenda 14/4/2020
P. 132

Concept 5                                                           Concept Strengths:

                                                                      ▪ Strong case which demonstrates how a local campus will
                                                                          enhance HE provision and address skill shortages
    Overview
                                                                      ▪ Clear market failure argument which the project will address
    A new university campus focused on addressing                         through retaining young people, increasing educational
    specific skills shortages in the local economy including              attainment, and supporting local people to access high level
                                                                          skilled jobs
    advanced manufacturing, health and clean energy.
                                                                      ▪ Key partners identified

    Project Name               University Campus                      ▪ Positive feasibility assessment which indicates the project can
                                                                          be sustained once operational within a short time frame (i.e. 2-3
                                                                          years) under various sensitivity tests
    Project Type               Skills and Enterprise
                                                                      ▪ Identified student spend facilitated by scope for student
    Total Cost & TIP Funding   c.£13m (c.10.4m TIP request / 80%          accommodation to attract students to Barrow
    Request                    intervention rate)                     ▪ Route to private sector leverage identified
                               Capital
    Location                   Barrow Island                          ▪ Contribution to inclusive growth with targeted plans to improve
                                                                          access to HE for the most disadvantaged

    Direct outputs             New 3,100 sqm building; 1,000 HE       Concept Weaknesses:
                               students by 2032; 6,000 graduates
                               between 2022-2032                      ▪ Distance of proposed location to town centre may limit
    Wider impacts              Higher level skills; improved              regeneration benefits and ability to access by sustainable
                               productivity, business growth and          transport
                               innovation; graduate retention;        ▪ Short time frame for delivery which may be impacted by current
                               regeneration and vitality                  economic uncertainty

                                                                      ▪ High intervention rate with match funding still being explored
   Copyright © Hatch 2018. All Rights Reserved.
   127   128   129   130   131   132   133   134   135   136   137