Page 228 - Shaping A Sustainable Future
P. 228

Figure 7: Office equipment.


            Office  equipment  is  properly  shut  down  when  not  in   Waste Minimization
            use.  Cooling  towers  are  cleaned  weekly;  compressors
            are refilled with a cooling water supply. Good to check   Waste Management, Raw Material, and Product Storage
            on  any  refrigerant  leakage  from  the  compressors  and   The  company  has  a  standard  operating  procedure  for
            freezers and, if there are, record.                  the reduction of waste from the over-ordering of certain
                                                                 materials.  The  waste  from  fish  parts  (bone/scale/gut/
            Seven-day timers will be put on some equipment, e.g.   head – Figure 8), cartons, plastic wraps and packaging
            water coolers, shredders, and printers, to be powered   bags are properly recycled and disposed of. They have
            down during non-office hours. Place signage to remind   engaged a registered waste collection contractor.
            staff to switch off the power before leaving the office.
            Most freezers are functioning, but some, as they are old,   A  waste  minimization/reduction  program  with  clearly
            have thermostats are fluctuating below -18°C, refer to   defined objectives and goals will ensure that batches of
            the next section. No standby generator during a power   contaminated raw materials and products are correctly
            outage; refer to the next section.                   disposed of and recorded.
















                                             Figure 8: Fish bones and fish scales as raw materials.


                                                              226
   223   224   225   226   227   228   229   230   231   232   233