Page 16 - GTE brand guidelines
P. 16
JOB FLOW
As you can see we are able to insert logos from the main contractor, maps of the location so there is no confusion on where to go.
Next I like to put a project description. This is taken direct form the tender letter we issued. This is a quick fire way to keep everyone informed with all correct information all the time.
16 OPERATIONS MANUAL 2021