Page 10 - QR CIMAR GROUT PUMP
P. 10

CSGP/TEESIN/MAN/01/15                                                       Compile by CJ

4. Pre-Operation and Operation Instructions

4.1) Pre-Operation Instructions

             CAUTION! (Note: Applicable to CSGP-2H & CSGP-10)
     Make sure there is no oil and water on the equipment (CSGP-2N & CSGP-10)

         platform that may cause slip and fall injury.
     Insert the lever (figure 3.1)
     Tighten the bolt to secure the lever onto the pivoting shaft (figure 3.2).
     Make sure all camp locks are tightly lock up (figure 3.3).
     Make sure the pressure gauge point at 0 psi or bar (figure 3.4)

4.2) Operation Instructions

     Adopt a secure footing on the platform of the pump (figure 3.5).
     Push forward the lever to pump the cement (figure 3.6).

         CSGP-1D:
     Figure 3.7 & 3.8 illustrate the manual pumping process of CSGP-1D pump.

                       For technical questions, please call +65 - 66431213  9
                       For Products Enquiry, please call +65 - 67581211
   5   6   7   8   9   10   11   12   13   14   15