Page 10 - QR CIMAR GROUT PUMP
P. 10
CSGP/TEESIN/MAN/01/15 Compile by CJ
4. Pre-Operation and Operation Instructions
4.1) Pre-Operation Instructions
CAUTION! (Note: Applicable to CSGP-2H & CSGP-10)
Make sure there is no oil and water on the equipment (CSGP-2N & CSGP-10)
platform that may cause slip and fall injury.
Insert the lever (figure 3.1)
Tighten the bolt to secure the lever onto the pivoting shaft (figure 3.2).
Make sure all camp locks are tightly lock up (figure 3.3).
Make sure the pressure gauge point at 0 psi or bar (figure 3.4)
4.2) Operation Instructions
Adopt a secure footing on the platform of the pump (figure 3.5).
Push forward the lever to pump the cement (figure 3.6).
CSGP-1D:
Figure 3.7 & 3.8 illustrate the manual pumping process of CSGP-1D pump.
For technical questions, please call +65 - 66431213 9
For Products Enquiry, please call +65 - 67581211