Page 69 - National Express_ GMStands
P. 69

5.0        Facilities, Tools & Equipment



        Wherever possible, Group Companies should ensure that there is adequate facilities to ensure a full and
        comprehensive pre-use check can be undertaken, this must include but is not limited to:

            Adequate lighting or provision of torches for drivers / engineers
            Adequate hard standing
            A safe working environment with as little vehicle movements as possible and adequate space between
            parked vehicles.

        Where possible, and available Group Companies should provide those who are responsible for pre-use
        checks with adequate tool and equipment, for example tyre tread depth indicators and torches.


        6.0        Defects Identified in Service



        Group Companies must ensure that there is a policy for recording and reporting defects that occur in
        service. This policy must include a robust processes for the reporting of these defects and the criteria for
        the decisions made regarding roadworthiness. This criteria must be in line with local legislative
        requirements and company policy. Note that vehicles must be removed from service if they are not
        compliant to local legal requirements or defined company policy.



        7.0        Post Use Checks



        Group Companies must ensure they give consideration to a process of post use checks, at the end of the
        last journey, to ensure that there are no obvious defects present on the vehicle after use. This may be
        completed as part of other post use checks for lost property and customers for example.


        8.0        Vehicle Pre-use Check Monitoring



        Each Group Company must ensure there is a process of reporting and monitoring the vehicle pre-use
        check process.

        This monitoring should include a robust process for auditing to ensure that the vehicle pre-use check policy
        is being correctly and consistently adhered to. This will include:

          Defects are being reported by those responsible in line with the set criteria
          The correct documentation or system is being completed fully and correctly.
          Defects are being reviewed, by the correct personnel, prior to vehicles being released for service.
          Documentation is being signed off before the vehicle is released for service
          Rectification work is to the required standard
          Defect management is in line with policy in terms of rectification, deferral and signing off as
            serviceable.





                         Global Maintenance Standard: Vehicle Pre-use Checks & Defect Reporting                 9
   64   65   66   67   68   69   70   71   72   73   74