               Rencana Jaringan Jembatan Kabupaten Merauke
               Merauke Regency Bridge Network Plan


               Jembatan/ Bridge Nakias 1    :  40 meter
               Jembatan/ Bridge Nakias 2    :  90 meter
               Jembatan/ Bridge Tegaepe 1   :  35 meter
               Jembatan/ Bridge Tegaepe 2   :  35 meter
               Jembatan/ Bridge Kuyakom     :  40 meter
               Jembatan/ BridgeEli          :  20 meter
               Jembatan/ Bridge Yacob       :  30 meter
               Jembatan/ Bridge Kali Wayau/ Ones  :  30 meter
               Jembatan/ Bridge Kali Wayau/ Ones   :  30 meter



               sumber: Dinas PUPR / Source: PUPR Office


               Pada tahun 2023, Pemerintah Kabupaten Merauke        In 2023, the Merauke Regency Government carried out
               telah melakukan total 12.667 m peningkatan jalan     12,667 m of road improvements under its authority with
               di bawah kewenangannya dengan anggaran sebesar       a budget of Rp73,581,828,000. Road construction is also
               Rp73.581.828.000. Terdapat juga pembangunan jalan di   underway in Waantarma Village and Alfasera Road in Kamp.
               Kampung Waantarma dan pembangunan ruas jalan Alfasera-  Pahas. The total length of roads in the two regions reached
               Kamp. Pahas. Total panjang jalan di kedua wilayah tersebut   11,314 m with a budget of Rp 21,550,090,000.
               yang dibangun mencapai 11.314 m dengan total anggaran
               sebesar Rp 21.550.090.000.

               Untuk infrastruktur jembatan, pada tahun 2023 Pemerintah   For bridge infrastructure, in 2023, the Merauke Regency
               Kabupaten Merauke telah menyelesaikan pembangunan    Government has completed the construction of four bridges,
               empat jembatan, yang berlokasi di Distrik Muting, Ulilin,   located in Muting, Ulilin, Jagebob, and Kampung Kondo
               Jagebob dan Kampung Kondo, dengan total anggaran sebesar   Districts, with a total budget of Rp 1,898,395,000.
               Rp 1.898.395.000.
               Peningkatan Jalan Tahun 2023

               Road Improvement in 2023


                                                             PANJANG (m) /   LEBAR (m) /
                KEGIATAN / ACTIVITY                                                       BIAYA (Rp) / COST (Rp)
                                                             LENGTH (m)    WIDTH (m)
                Pengecoran Jalan Masuk Puskesmas Ilwayab     78            5               Rp      499,700,000
                Pj. Kimaam-Sabudom                           734           5               Rp   6,853,880,000
                Pj. Okaba-Wambi                              600           4               Rp   3,830,095,000
                Pj. Pelabuhan Kimaam-Kimaam                  344           5               Rp   3,233,794,000
                Pj. Sanggase-Okaba                           797           4               Rp   5,333,160,000
                Pj. Sp. Muting-Muting                        805           7               Rp   4,130,736,000

                Pj. Sp. Yanggandur-Yanggandur                1000          7               Rp   3,496,900,000
                Peningkatan Ruas Jalan Kaliki / Kaliki Road Section
                                                             1189          5               Rp   4,750,115,000
                Improvement