Page 21 - Q2_2022_Rosendin_Corp_Newsletter
P. 21

KAISER PERMANENTE SPRINGFIELD                            VANTAGE SOUTH END


 MEDICAL OFFICE BUILDING                                  EAST OFFICE TOWER
 LOCATION: Springfield, VA  LOCATION: Charlotte, NC
 CLIENT: Kaiser Permanente  CLIENT: The Spectrum Companies
 GENERAL CONTRACTOR: Hensel Phelps Construction  GENERAL CONTRACTOR: Rodgers Builders, Inc.
 BUDGET: $7.4 Million  BUDGET: $4.8 Million
 Rosendin is the design-assist electrical contractor,   Rosendin provided complete electrical construction
 developing value engineering solutions, for this   services for this 11-story mixed-use building located
 new 99,500 SF outpatient ambulatory care building   in the South End of Charlotte, NC. This tower is
 and adjacent parking area. The facility will house   the twin to the tower next door, which was also
 ambulatory surgery, procedure rooms, clinical   completed by Rosendin. Together, the two buildings                  PROJECT PROFILES
 decision units, diagnostic imaging, clinical laboratory,   total more than 577,000 SF of space and include a
 retail, pharmacy, and primary and specialty clinics.  conference center, fitness facility, and private terraces.













 PROJECT PROFILES





 QUEEN EMMA     THE CENTURY PLAZA


 BUILDING RENOVATION  HOTEL AND TOWERS
 LOCATION: Honolulu, HI
                                                          LOCATION: Los Angeles, CA
 CLIENT: Ahe Group/Southport Financial/AHED
                                                          CLIENT: Next Century Partners, LLC
 GENERAL CONTRACTOR: Swinerton Builders
                                                          GENERAL CONTRACTOR: Webcor Builders
 BUDGET: $2.8 Million
                                                          BUDGET: $44 Million
 Rosendin served as the electrical contractor for         Scheduled for demolition, the Century Plaza
 the conversion of a 12-story office building in          Hotel was added to the National Trust for Historic
 downtown Honolulu into a 71-units of affordable          Preservation in 2009, saving the iconic structure
 residential housing. The historic Queen Emma             for future generations. The nearly $2.5 billion
 building was originally constructed in the 1960s         mixed-use redevelopment project includes 400
 and is a local landmark. It was previously used as       guest rooms, 63 residences, a state-of-the-art
 an office building but was empty for 15 years.
                                                          ballroom designed to accommodate Hollywood’s
                                                          largest awards events, and luxury amenities in the
 In order to address the affordable housing crisis        renovated hotel. The design for the remainder of
 in Honolulu, the building was converted into             the 6.4-acre complex incorporates a public plaza
 studio, one, and two-bedroom apartments.
                                                          and outdoor garden space with the hotel flanked
                                                          by two 46-story residential towers. The condos
                                                          will be “the most elegant condominium homes
                                                          ever built in Los Angeles,” according to the official
                                                          release. The entire project, from design to amenities
                                                          and services, is created to envision the glamour,
                                                          glitz, and indulgence that is uniquely Hollywood.

 Credit Wally Gobetz; https://creativecommons.org/licenses/by-nc-nd/2.0/


 20  |  THE FEEDER
   16   17   18   19   20   21   22   23   24   25   26