Page 29 - Q1_2023_Corp Newsletter
P. 29
DEPARTMENT NAME
odular Power Solutions (MPS) is excited to
announce that they have opened a new
M 190,000 SF facility in Lewisville, Texas. The
opening of this facility is an advantageous development
for MPS, which has a robust backlog through 2026.
Conveniently located in the Dallas/Ft. Worth region, the additional
space, and the ability to give MPS access to an additional labor pool
will allow them to produce higher volume for longer commitments
of booked work. The design of the Lewisville location incorporates a
different production layout from the more well-known MPS facility
in Sherman, Texas.
In Sherman, the facility has pod structures sorted by product type
and/or customer, allowing each pod to operate as a distinct business
if necessary. The Lewisville facility is set up by workstation to
produce like products at optimal levels of throughput. The system
works as a manufacturing line, making it possible to accomplish
more work progressively. This location brings great benefits to new
and existing customers and employees as it is easily accessible from
many other surrounding cities.
Alec Overn, Business Manager for MPS notes, “The addition of our
Lewisville facility opens greater production capacity for our existing
customers and gives us the space to leverage our greatest strengths
in design innovation. We look forward to continuing our legacy of
superior custom solutions and hope to continue to transform the
ways we think about industrialized construction.”
The new location has opened up numerous possibilities for the
fast-growing company. If you’re in the DFW area, reach out to MPS
for a tour of the new facility. Pictured Above: The new Lewisville facility features a station-by-
station layout rather than the pod structure found in Sherman
THE FEEDER | 29