Grea tfields School
The Project
This was a multi-phase project of purpose-built new classrooms
and support facilities for 1,800 pupils in the 11-18 age group,
located in Barking, Essex. The construction comprised of the
latest timber technology to provide a ‘fast track’ approach to a
new education facility.
Our Role
EDP Environmental was commissioned to carry-out the
detailed MEP Design. We also developed the Energy Strategy
in accordance with the London Plan and determined the most
cost-effective way to meet the 30% Carbon offset requirement.
Our expertise in Thermal Modelling using TAS software was
valuable in ensuring compliance with BB101 and meeting the
BREEAM level of “Very Good”.
Technical/ Factual Statements
• A 57kW PV array has been installed on the latest block.
• On completion of the scheme there will be over 200kW of
PV installed throughout the campus.
• A fibre optic back bone will be run throughout the various
buildings to provide a dedicated IT network. This will also
be used to carry security, CCTV and access control data
around the site.
OUR projects
Client London Borough of Barking
Architect Surface To Air
Main Contractor MID Group
Services Contractor Greenside Integrated Services
Project Value £ 35M