Page 38 - Hesham Mokhtar's portfolio
P. 38
02 The A B C D E F G H I B J K L M N O P Q R S T U V PLOT LIMIT N
1
UP
2
2
PUMP 300 2.60 2.60 49 160 23 22 2.50
ELE.
C 300 60
3 4 3.60 0.40 2.30 4.50 4.50 210 70 160 170 230 160 260 160 230 32.83 160 230 160 230 170 160 523 8.20 STORE 220 220 13.00 FEMALE 160 32 4.00 LOBBY 140 TOI. 200 Slope - 10% 5.50 5.50 21
300
+0.90m
300
ELECT
02-1 MOSQUE 5 6 7 5.20 4.50 5.20 35.60 PRAYER HALL 2.80 3.60 ABLUTION 180 TOILETS 200 140 TOI. 140 200 140 200 5.50 2.50 25 24 3.75 20 5.50 2.50
140
104.0 SQ.M
TOI.
85 Prayers
4.60
19
TOI.
8.00
JANITOR
20.11
AJMAN 8 5.00 110 4.50 5.00 3.00 2.50 27 26 DRIVE WAY 38 5.50 DRIVE WAY 18 17 2.50
3.80
9
110 160 3.80 1.80 5.00 21.10 2.50 5.50 28 3.75 37 2.50 2.50 5.50 39 5.50 16
1.80
MOSQUE A 38.80 R3.60 4.00 2.30 6.80 27.90 MAIN PRAYER HALL 3.00 3.00 PRAYER HALL A - PLOT - 29 36 5.50 2.50 5.50 40 15 2.50
MIMBER
SECONDARY
794.0 SQ.M
1570.0 SQ.M
10
+0.90m
3 7.20 MEHRAB +0.90m 1310 PRAYERS 38.40 3.00 28.00 660 PRAYERS 2.82 SHOE RACKS 2.50 75.88 2.50 5.50 30 DRIVE WAY 35 2.50 41 5.50 14
+0.90m
This project involves the design and development 11 ELE. 1.80 2.30 1.80 1.90 3.00 270 2050 100 133 2.50
110 18.57 3.00 300 Slope - 09% 801 31 34 5.50 UP 3.75 13 - PLOT -
of a grand mosque located on a 3,405-square-me- 12 13 3.80 160 110 3.80 4.50 5.25 1.90 120 20 +0.90m 5.50 12 94.74
170 3.00 400 18.85 5 33 5.50 2.50
ter plot overlooking the stunning sea of Ajman, 5.00 160 4.90 3.00 22.61 2.94 270 452055 ELE. DRIVE WAY 11
14 170 4.50 1.79 SHOE RACKS SHOE RACKS 340 DRIVE WAY 32 2.50 2.50
UAE. The mosque is designed to accommodate 15 5.20 180 160 5.30 5.00 ABLUTION 18.60 3.66 133 100 50 1 10
+0.90m
35.60 15.30 4.98 ELE. 5.50 9 2.50
185
more than 2,000 worshippers, making it a signifi- 16 210 70 160 170 230 160 260 160 230 160 230 160 230 170 160 113 155 190 TLT. TLT. TLT. TLT. TLT. TLT. 16.70 5.77
3.60 0.40 2.30 4.50 4.50 44.03 28.73 110 110 110 110 110 110 TOILETS 4.60 3.17 3.30 3.75 5.50 8
cant landmark and spiritual hub for the community. C 7.10 400 110 260 110 110 110 110 110 110 6.50 230 240 +0.90m 120 +0.90m
155 190 TLT. TLT. TLT. TLT. TLT. 190 TLT. TLT. HC. TLT. HC. TLT. JANITOR 5.15 DRIVE WAY 7
17
13.56 1.95
UP 2.60
+0.15m 2.50
18 2.60 6
4 B DRIVE WAY
COMMERCIAL
ELE.
5
5.50
4 U A E
NORTH
3.30
PLOT LIMIT R3.60 2 2.50
ISLAMIC PATTERNS 3
DOME TOP LVL
+14.85 M. SSL.
25.00 ISLAMIC PATTERNS 180 02 01 25.00 PARAPET LVL SSL. R6.00 5.50 1
+12.95 M.
ISLAMIC PATTERNS 1.80 MAIN PRAYER HALL ROOF QIBLA 258°-13'-18" DRIVE WAY
+11.15 M.
SSL.
01 FEMALE PRAYER PARAPET DRIVE WAY 5.40
ISLAMIC PATTERNS +9.10 M. SSL.
1.50 FEMALE PRAYER ROOF 3.75 9.64
01 +7.60 M. SSL.
ABLUTION ROOF PRAPET PLOT LIMIT
DOME TOP LVL +6.60 M. SSL.
+14.85 M. SSL.
10.25 1.50 ABLUTION ROOF 3.30 PROPOSED G.
25.00 ISLAMIC PATTERNS 180 02 01 +5.10 M. SSL. 25.00 PARAPET LVL SSL. SERVICE BLOCK
+12.95 M.
6.70 Slope - 09%
ISLAMIC PATTERNS 1.80 MAIN PRAYER HALL ROOF
4.20
+11.15 M.
SSL.
GROUND LVL. 8.04
+0.90 M. 01 FFL. INT.LVL. FEMALE PRAYER PARAPET
+9.10 M.
SSL.
0.75 +0.15 M. FFL. RD.LVL. FFL. 5.63
± 00 M.
SSL.
+7.60 M.
01 1.50 FEMALE PRAYER ROOF PROPOSED G.FLR MASJID
ABLUTION ROOF PRAPET CAR ENTRY
SSL.
ELEVATION - 01 10.25 1.50 ABLUTION ROOF SSL. DRIVE WAY
+6.60 M.
+5.10 M.
6.70
4.20
GROUND LVL.
+0.90 M. FFL. INT.LVL.
0.75 +0.15 M. FFL. RD.LVL. FFL.
± 00 M.
ELEVATION - 01
3.00
5489
480
- PLOT -
64.77
ISLAMIC PATTERNS DRIVE WAY PROPOSED G+1 - - R O A D - -
IMAM HOUSE UP
DOME TOP LVL
+14.85M. SSL.
02 02
PARAPET LVL
01 25.00 01 180 01 +12.95 M. SSL. PLOT LIMIT 3.76
ISLAMIC PATTERNS +0.15m
01 1.80 MAIN PRAYER HALL ROOF
+11.15 M. SSL.
FEMALE PRAYER PARAPET
ISLAMIC PATTERNS +9.10 M. SSL. 17.70
1.50 +7.60 M. SSL. 16.64
FEMALE PRAYER ROOF
ABLUTION ROOF PRAPET 14.60
DOME TOP LVL +6.60 M. SSL.
+14.85M. SSL. 21.86
ABLUTION ROOF
02 02 10.25 1.50 +5.10 M. SSL.
01 25.00 01 180 01 PARAPET LVL
ISLAMIC PATTERNS +12.95 M. SSL.
6.70
01 1.80 MAIN PRAYER HALL ROOF
4.20 +11.15 M. SSL.
GROUND LVL. CAR EXIT
+0.90 M. FFL. INT.LVL. FEMALE PRAYER PARAPET
+9.10 M.
SSL.
0.75 +0.15 M. FFL. RD.LVL. FFL. 3.50 PLOT LIMIT
± 00 M.
1.50 FEMALE PRAYER ROOF PLOT LIMIT
+7.60 M.
SSL.
ABLUTION ROOF PRAPET
ELEVATION - 02 10.25 1.50 ABLUTION ROOF SSL. SSL. 1 SETTING OUT LAYOUT PROVIDED PARKING - 41 CARS
+6.60 M.
+5.10 M.
6.70 Scale: 1:100
4.20
GROUND LVL.
+0.90 M. FFL. INT.LVL.
RD.LVL.
0.75 +0.15 M. FFL. ± 00 M. FFL.
ELEVATION - 02