Case Studies
NSE KM426
▪ Geotechnical Model of Remedial Works
Slope Repair
Method
• 18m & 12m long
soil nail with 3m
c/c spacing at
second tier
• 18m & 12m long
soil nail with 1.5
c/c spacing at
second slope
surface
• 4m height of
rockfill
• 5m height of fill
embankment at
second and third
tier