KAEDAH BUANG & GANTI ( Dengan/Tanpa Geotekstil)
Determination of Depth Removal
Klausa 20.2.2 ( JKR Road Specification :
Section 20) & Klausa 2.2 ( JKR Building
Specification : Section V)
The depth of removal shall be as shown
in the Drawing or as determined by trial
pits or JKR/Mackintosh Probe test as
approved by the S.O. The trial pits or
probe test shall be carried out at
locations as indicated in the Drawing or
as instructed by the S.O. The apparatus
used shall be the standard JKR probe or
Mackintosh probe. Procedure of works
and details of the JKR probe and
Mackintosh probe are as per latest
revision of JKR Standard Specification for
Roadworks, Section 17: Site
Investigation.