Page 43 - PENGAWASAN KERJA RAWATAN TANAH
P. 43

TIANG BATUAN (STONE COLUMN)                                                   SPESIFIKASI PIAWAI BANGUNAN JKR : SEKSYEN V – KLAUSA 6
                                                                                    SPESIFIKASI PIAWAI JALAN JKR : SEKSYEN 20 – KLAUSA 20.6


            Material: Cl 6.9 & Cl 20.6.9

            • Batuan semulajadi/ batuan yang dipecahkan
               (crushed)/batuan yang dikitarsemula dan mesti
               mematuhi:

                  • The Aggregate Crushing Value (ACV) ≤ 30%
                  • The Flakiness Index ≤ 30%
                  • The average loss of weight in the sodium sulphate
                    soundness test (5 Cycles) ≤ 10%
                       • The gradation shall comply with Table V8 / Table
                          20.8


















                                                                                                                                    44
   38   39   40   41   42   43   44   45   46   47   48