Page 63 - PENYIASATAN TAPAK
P. 63
DEEP BORING
8. Backfilling of Borehole and Borehole Marker
a. Backfilled with free-flowing sand or silt
b. Refer to MS 2038 : 2006 Clause 4.2.9
c. Size of concrete base : 300mmm x 300mm x
300mm
d. Minimum length of perforated PVC pipe :
5.0m including exposed 0.5m above ground.
e. The marking of the borehole must be clearly
labelled, colored and permanent (at PVC
pipe and/or concrete base)
Borehole Marker