Page 17 - Seminar Spesifikasi Piawai Geoteknik Section 16
P. 17

PRESENT SPECIFICATION (2014)






                                                                                                             1.     HORIZONTAL DRAIN INSTALLATION

                                                                                                             2.     GEOCELL
                                                                                                             3.     SOIL NAILING


                            1   ROCK                                                                         4.     GUNITTING
                                                                                                             5.
                                                                                                                    ROCK BOLTS AND ROCK DOWELS
                                SLOPES
                                                     3                                                       6.     GROUND ANCHOR
                                                                                                                    REINFORCED SOIL STRUCTURES AND
                                                                                                             7.
              3                                     SURFACE                                                         SLOPE

                                                    PROTECTION

           RETAINING               11                                                                        8.     TIEBACKS WORKS
           STRUCTURES                                                                                        9.     GABIONS
                                                                                                             10. GABIONS REINFORCED EARTH SYSTEM

                                                                                                             11. HYDROSEEDING


                               4    INTERNAL


                                    STABILISATION
   12   13   14   15   16   17   18   19   20   21   22