Page 12 - Seminar Spesifikasi Piawai Geoteknik Section 16
P. 12

DESCRIPTIONS OF CURRENT SECTION 16:2014










          Ref.       Standard                    Specification Content

                     Specification for

                     Road Works :

                     Section 16

         16.4        Guniting                    16.4.10 (f) The Contractor shall engage a specialist geotechnical engineer accredited by BEM

                                                 or ACEM/IEM, to study and propose rectification works, when defective works are identified
                                                 and directed by the S.O. The Contractor shall be fully responsible for the costs, time delay in

                                                 works and other incidental consequences for the defective works. The proposed

                                                 rectification works, if accepted by the S.O., shall be carried out at the Contractor's own

                                                 costs.