Page 7 - Seminar Spesifikasi Piawai Geoteknik Section 16
P. 7
DESCRIPTIONS OF CURRENT SECTION 16:2014
Ref. Standard Specification for Road Standard Specification for
Works : Section 16 Building Works :
Section U
16.1 Horizontal Drain Installation U1
16.2 Geocell U2 COMMON MISTAKES/
INTERPRETATIONS:
16.3 Soil Nailing U3
• MATERIAL
16.4 Guniting U4 SUBMISSION/APPROVAL
16.5 Rock Bolts And Rock Dowels U5 • METHOD OF STATEMENT
16.6 Ground Anchor U6
16.7 Reinforced Soil Structures And Slope U7
16.8 Tieback Works U8
16.9 Gabions U9
16.10 Gabions Reinforced Earth System U10
16.11 Hydroseeding U11