Page 16 - 7 Signal Evalution Journey
P. 16
signal bn inventory it resolved day to day issues of
jawan and families
July to Sweat, Sparks, and Solidarity
September The unit’s ethos shifted from survival to growth:
2024
Infrastructure Overhaul: Personnel cleared jungles
at Hathi Chowk, installed electricity, and built a
badminton court from a garbage-strewn yard.
An electricity fault accords in Hathi Chowk. Due to
the storm and heavy rain and civil truck hit the
electric line. 7 Bn requested GCO KKT for rectifying
the line but it was not done sighting irrelevant
reasons. This in human activities cause great suffer to
Jawans at presiding at Hathi Chowk. It also impacted
canteen functioning. Again, higher offices were
approached and IG (Comn&IT) have to visit in
person to resolve the matter. On the direction of IG
(Com & IT) electricity line again restored at the Hathi
Chowk.
11 Sept 2024 Opening of Multipurpose Hall. There was no such
type of space available for conduiting regimental
function like sainik samelan meeting conference etc.
after opening of multipurpose hall problem of space
for official gathering has been resolved.
31 October Cultural Pride: Diwali 2024 saw jawans decorating
2024 barracks with lights and rangoli, forging bonds
through a communal bara Khana
Engineering Triumph:
A running track was carved through thorn-covered terrain, symbolizing
the battalion’s unstoppable momentum.
Quote from the Field: “Every corner of this campus now bears the mark of our
hands. We transformed impossibility into legacy.”
16