Page 3 - Overview_How do I create an Award Request - Initial PAN
P. 3

Award Request – Initial PAN


                                                       V102.docx for detailed steps.
        V                    Generate Award from       PAN Awards will create a Project and Activity when the award is
                             Proposal Version V102     generated the first time. A full award and contract will be created
                                                       when the PAN is converted to a full continuation.

                                                            Please make sure that the Pre Award Spending check box
                                                              is selected when you are initiating a PAN award. Failure to
                                                              do so will result in generation of an award and a contract
                                                              which may not be the intended action at this processing
                                                              stage.

                                                       Refer to the Job Aid  How do I Generate an Award from Proposal
                                                       Version V102.docx for detailed steps.

        VI                   Review PAN Project        You will Review and Verify the initial project and activity created in
                                                       this step.

                                                       Refer to Job Aid How do I Verify an initial PAN project.docx
        VII                  Setup Speedcharts         SpeedTypes need to be setup for all Projects and Activities on the
                             Specific to the Project      PAN. The SpeedType should reflect the Project ChartField
                                                       combination that reflects the Grant. You should pay particular

                                                       attention to Fund Code, Department, Operating Unit and Class
                                                       while setting up the SpeedTypes.
                                                       Refer to the Job Aid  How do I set up a SpeedType.docx for detailed
                                                       steps.

                                                           You will need to Email the appropriate department so that
                                                           they can correctly review the details of PAN Project, Activity
                                                           and Speedcharts that were created.


        Workflow

        The Award Setup routes to appropriate OSP/OTT/FGC manager based on your department. If you have been
        given specific system roles, the workflow auto-approve and routes to the FGC.
        The approver will typically find the approval request in his/her Worklist, they can also navigate to this page to
        approve or deny the award setup request.

        The workflow for PAN Requests has 5 stops: Originator Manager, FGC Proposal, FGC Proposal (Quality Check
        (QC), FGC Award, and FGC Award Quality Check (QC).