Page 4 - How do I Create a New or Renewal Award
P. 4

Creating New or Renewal Awards


        VII                Request SpeedChart    SpeedCharts need to be defined prior to finalizing
                                                 Award Budgets. The SpeedType should reflect the
                                                 Project ChartField combination that reflects the Grant.
                                                 You should pay particular attention to Fund Code,
                                                 Department, Operating Unit and Class while setting up
                                                 the SpeedTypes.

                                                 Refer to the Job Aid How do I Request a SpeedChart
        VIII               Finalize Budgets      Once the Grants Peer Team approves the Speedchart
                                                 request, Award Budgets can be finalized.
                                                 Make sure that you never Finalize Award Budgets prior
                                                 to Speedchart approval. You will need to review the
                                                 Speedchart field on the Award budget page and make
                                                 sure that it doesn’t start with RQST before you click the
                                                 Finalize button.
                                                 Refer to the Job Aid How do I Finalize Award Budgets
                                                 for detailed steps.

        IX                 Print Electronic Notice  Electronic Notice of Awards (eNOA) are generated
                           of Award (eNOA)       when terms of an award are acceptable. The eNOA
                                                 prints direct and indirect funding, beginning and end

                                                 dates and ChartField string associated with the award.
                                                 You will prepare and upload the eNOA associated with
                                                 the award
                                                 Refer to the Job Aid How do I generate an ENOA for
                                                 detailed steps.
        X                  Setup Contract        The next steps after award setup is contract setup that
                                                 affects billing, LOC management and other post-award
                                                 activities.  Contracts will be appropriately setup based
                                                 on the type of PRODUCT. You will also make the
                                                 contract active, activate bill and revenue plans and
                                                 enter ChartFields to contract lines. Please follow the
                                                 appropriate Job Aid based on your PRODUCT.

                                                 Use one of the following Job Aids based on the Contract
                                                 Type/Product:
                                                     •  How do I Set up an LOC Contract
                                                     •  How do I Set up a Non-LOC Contract
                                                     •  How do I Setup Fixed Contract
                                                     •  How do I Setup a Prepaid Contract
                                                     •  How do I Set up a Hybrid Contract with More
                                                         Than One Product (Fixed, non-LOC etc.)



        Workflow

        The Award setup is routed to appropriate OSP/OTT/FGC manager based on your department. If you have been given
        specific system roles, the award setup workflow will auto-approve and be routed to the FGC.
                                                                                                             Page 4 of 5
         Emory Confidential and Proprietary           Last Revised on 12/6/2018                 Return to Table of Contents
   1   2   3   4   5