Page 2 - PROYECTO ING. ALTA TENSION
P. 2

PROYECTO ELÉCTRICO









                                    ADECUACION DE LINEA AT














                                 “TRAMO DE LINEA SUB. WARNES,


                                             SUB LOS TRONCOS







                                           SISTEMA CRE: 115 KV






                                            LONGITUD: 76.14 KM
















                                                              2
   1   2   3   4   5   6   7