4. Requirement of Coaches & Holding
Depot KCG
Bare requirement 410
Total requirement 452
Actual holding (incl. spares) 441
5. Infrastructure for Maintenance of Coaching Trains
Holding
Pit Pit Cat HP
Depot Capacity Drainage M&P
line lights walks jet
(ICF)
PL-1 24 A A A A A
KCG PL-2 24 A A A A A
PL-3 24 A A A A A
Note: A – Available, NA-Not available
6. One Mechanized Laundry of 2 Ton capacity is available at KCG.
7. C&W Performance
Proportionate Actual
Performance Index Target (22-23) (21-22) (22-23)
upto Nov upto Nov
Ineffective % of AC coaches 1.5 0.47 1.24
Ineffective % Non-AC coaches 1 0.32 0.26
Enroute coach Territorial 0.67 0 0
detachments Ownership 1.33 0 0
IOH NA 262 232
Coaches marked sick within NA 0 0
100 days
Punctuality Direct 1.33 3 2
Losses In Direct 2 2 2
8. Road Mobile ART is available at KCG.
9. Area training centre available at KCG for training of Technicians and Khalasis of
HYB and NED divisions.