Commissioning of Lift at GWD:
One Lift of 13 Passengers Capacity, Machine-room less, Gearless lift, operating at a
speed of 1 mtr/sec with Center Openable-infrared sensor assisted transparent double
doors was commissioned. This lift was equipped with Automatic Rescue Device facility
and fireman‟s switch for the safety of passengers against any malfunctions.
Improvements to Goods shed at DHP:
Illumination of Good shed at Dichpalli (DHP) was improved by commissioning 5 Nos. of
high mast towers each having 4 x 150W LED flood lights for illumination of Good Shed
and 6Nos. of new street light poles were also commissioned for illumination of
approaching road.
High mast and street light at DHP Goods Shed
Energy Conservation Measures Undertaken:
Solar Water Heaters at RPFTC/MLY:
2 Nos. of 500 LPD capacity solar water heaters were provided on Inspector
Accommodation Building at RPFTC/MLY.