  Commissioning of Lift at GWD:

                One  Lift  of  13  Passengers  Capacity,  Machine-room  less,  Gearless  lift,  operating  at  a
                speed  of  1  mtr/sec  with  Center  Openable-infrared  sensor  assisted  transparent  double
                doors  was  commissioned.  This  lift  was  equipped  with  Automatic Rescue Device facility
                and fireman‟s switch for the safety of passengers against any malfunctions.





















                 Improvements to Goods shed at DHP:

                Illumination of Good shed at Dichpalli (DHP) was improved by commissioning 5 Nos.  of
                high  mast  towers  each  having  4  x 150W LED flood lights for illumination of Good Shed
                and  6Nos.  of  new  street  light  poles  were  also  commissioned  for  illumination  of
                approaching road.
















                                      High mast and street light at DHP Goods Shed


            Energy Conservation Measures Undertaken:

                 Solar Water Heaters at RPFTC/MLY:

                2  Nos.  of  500  LPD  capacity  solar  water  heaters  were  provided  on  Inspector
                Accommodation Building at RPFTC/MLY.