Page 63 - CompleteBooklet2021
P. 63
7. Approach Warning System for both Up and Dn directions in 02 mid-section
interlocked LC gates provided at LC189A & LC12. All 39 mid-sections interlocked LC
gates have been completed.
8. Carried out signaling alterations in relay room and replaced operating panel in
connection with proposed Satellite Track Machine Depot at Cavalry barracks and
commissioned.
9. Carried out linking of datalogger with Control office application (COA) for reporting
train arrival/departure timings at Mahbubnagar, Medchal & Umdanagar stations.
10. Existing single line pushbutton token less block instrument between BVO-DHNE
section replaced with UFSBI along with HASSDAC of CEL make working on dual
media (OFC & Quad cable).
60