OPERATING
A. COMMISSIONING OF DOUBLING AND YARD ARRANGEMENTS FOR NEW LINES
Umdanagar –Shadnagar (29.76 km) : Doubling commissioned on 21.07.2021
Falaknuma - Umdanagar (13.98 km) : Doubling commissioned on 26.03.2021
Cavalry Barracks yard : Yard remodeling in connection with
Track machine satellite depot was done
and commissioned on 10.02.2021.
Shadnagar – Gollapalli (30.23kms) : Doubling commissioned on 16.09.2020.
Manoharabad- Gajwel (31.07 km) : New line between Manoharabad and
Gajwel commissioned on 18.06.2020.
Jaklair – Makthal (11.47 km) : New line between Jaklair and Makthal
commissioned on 05.06.2020.
B. COACHING
a) PUNCTUALITY:
The punctuality performance of Express Group trains from April-21 to Sep-21 is
95.97%.
b) TRAFFIC BLOCKS:
7457 hours of traffic Blocks were offered in 2021-22 (Upto Sep) as against 7029
hours of last year (Upto Sep) for Maintenance/ TWR/ elimination of LC gates and
Machine works, which is more by 6% against last year.
c) KISAN TRAINS:
22 Kisan trains loaded with “Onion” commodity are originated from KCG/KRNT,
st
which earned an amount of Rs. 358.96 lakhs. 1 Kisan train ran from KCG to GHY
on 23.08.2021.
C. FREIGHT
i. LOADING:
During the financial year (upto Sep-2021), the division has achieved 0.752MT (413.5
rakes) as against the loading of 0.783MT (407.5 rakes) done in 2020-21 and as against
proportionate target of 0.669 MT, which is more by 12.4% over target.
Revenue Loading: During 2021-22 (upto Sep-21), the division has achieved Revenue
loading of 0.686 MTs as against the revenue loading of 0.706 MTs done in 2020-21
and as against proportionate the target of 0.669 MTs, which is more by 2.6% over
target.