Page 89 - CompleteBooklet2021
        P. 89
     OPERATING
            A.  COMMISSIONING OF DOUBLING AND YARD ARRANGEMENTS FOR NEW LINES
                   Umdanagar –Shadnagar (29.76 km)              :  Doubling commissioned on 21.07.2021
                   Falaknuma  - Umdanagar  (13.98 km)           :  Doubling commissioned on 26.03.2021
                   Cavalry  Barracks yard                       :  Yard  remodeling  in  connection  with
                                                                    Track machine satellite depot was done
                                                                    and commissioned on 10.02.2021.
                   Shadnagar – Gollapalli (30.23kms)            :  Doubling commissioned on 16.09.2020.
                   Manoharabad-  Gajwel (31.07 km)              :  New  line  between  Manoharabad  and
                                                                    Gajwel commissioned on 18.06.2020.
                   Jaklair – Makthal  (11.47 km)                :  New  line  between  Jaklair  and  Makthal
                                                                    commissioned on 05.06.2020.
            B.  COACHING
                a)  PUNCTUALITY:
                    The  punctuality  performance  of  Express  Group  trains  from  April-21  to  Sep-21  is
                    95.97%.
                b) TRAFFIC BLOCKS:
                    7457  hours  of  traffic  Blocks  were  offered  in  2021-22  (Upto  Sep)  as  against  7029
                    hours  of  last  year  (Upto  Sep)  for  Maintenance/  TWR/  elimination  of  LC  gates  and
                    Machine works, which is more by 6% against last year.
                c) KISAN TRAINS:
                   22  Kisan  trains  loaded  with  “Onion”  commodity  are  originated  from  KCG/KRNT,
                                                                      st
                   which earned an amount of Rs. 358.96 lakhs. 1  Kisan train ran from KCG to GHY
                   on 23.08.2021.
            C.  FREIGHT
                i. LOADING:
                  During  the  financial  year  (upto  Sep-2021),  the  division  has  achieved  0.752MT  (413.5
                  rakes) as against the loading of 0.783MT (407.5 rakes) done in 2020-21 and as against
                  proportionate target of 0.669 MT, which  is more by 12.4% over target.
                  Revenue Loading: During 2021-22 (upto Sep-21), the division has achieved Revenue
                  loading  of  0.686  MTs  as  against  the  revenue  loading  of  0.706  MTs  done  in  2020-21
                  and  as  against  proportionate  the  target  of  0.669  MTs,  which  is  more  by  2.6%  over
                  target.
                                                            86
     	
