Page 84 - CompleteBooklet2021
P. 84

EMU CAR SHED , MOULA-ALI



            1. Auxillary Compressor Inspection Cover Modification:

                    An  inhouse  modification  of  inspection  cover  for  auxillary  compressor  in  3phase
                    EMU Motor coach has been carried out due to an inaccessible area and difficult to
                    open  the  closed  inspection  cover  for  checking  of  carbon  brushes  and  commutator.
                    This  inspection  cover  cannot  be  removed  due  to  less  space  between  auxiliary
                    compressor  and  coach  side wall .This modification is completed in all the 24 of AC
                    EMU 3phase motor coaches.



















                              Inaccessible space                             Modified cover



            2.Pantograph test bench:

                  An  in-house  test  bench  is  developed  for  3-  Phase  EMU/MEMU  Pantographs  testing
                  before  fitment.  PCME/SCR  inaugurated  the  test  bench.  In  appreciation  for  in-house
                  development  of  the  3  phase  pantograph  test  bench.  Award  of  Rs.2000/-  was
                  announced.


























                                                            81
   79   80   81   82   83   84   85   86   87   88   89