      Reusing Foundations




      Strategies for re-purposing foundations (1)
      creation of a piled raft
      Brief description:
      One of the concerns for reuse has been the continued
      loading of historic foundations to design loads with all the
      uncertainties that code changes can bring.  CGL on a project
      in Lambeth High Street, with structural engineers Iesis, were
      able to convert a piled structure to a new piled raft structure
      allowing a substantial reduction in pile loadings with the
      enhancement of the original floor slab to a raft.

        Ÿ  Site investigation
        Ÿ Foundation investigation
        Ÿ PLAXIS 3D ground modelling                                        Lambeth High Street (3D model of piles and rafting)
        Ÿ  Negotiations with NHBC

      Strategies for re-purposing foundations (2)
      reuse of piles

      Brief description:
      Working with Simpson Associates, CGL was engaged to
      provide a site investigation to assess the viability of reusing
      the existing piled foundations and incorporating them into a
      proposed new 14 storey concrete frame building with much
      higher foundation loads than the original 9 storey structure.
      Services provided were:

        Ÿ  Site investigation
        Ÿ Foundation investigation
        Ÿ  PLAXIS 3D ground modelling
                                                                                               191 Old Marylebone Road
                                                                              (graphical output of pile settlement computation)
      Reconfiguring demolition temporary support
      foundations

      Brief description:
      Working closely with Galliford Try on the Seymour Street site
      complex foundations and supports were rationalised. CGL
      provided considerable value engineering by lowering the
      foundations temporary gable support towers while
      maintaining tight party wall movement constraints.

        Ÿ  Analysis of gable support towers and  design of piled
          underpins
        Ÿ  Support on basement construction strategy and
          regulatory approval
        Ÿ  On site support for construction changes                                                    Seymour Street