Page 3 - Induction
P. 3

About














































     About This Project


     The project consists of 3 steel framed structures including traditional

     brick, block work and insulated panels. The main structure is the
     storage areas which include racked storage facilities. The third

     smaller two story structure is the administration centre which includes
     the main reception area, welfare facilities and offices with sales
     administration on the first floor.


     The project is valued at £160 million and is to be completed within 18
     months.


     Access to the site is via (name road).