Page 25 - eNewsletter NIISe Edisi 02
P. 25

Sites Infrastructure Scope of Work





















            Site Evaluation                      Site Preparation                     System Deployment
          Identify and evaluate                Planning the infrastructure                Perform solution
          the conditions of the                arrangements in branches                 preparation activities
         infrastructure; as-is, to             based on the outcomes of                     at branches.

           leverage and to-be.                   the sites assessment.





















                                                            Sites Assessments at LTA Senai Johor Bahru, Johor
































 Page   09    Page                                                                     NIISe eNewsletter Edition 2
   20   21   22   23   24   25   26   27   28