Page 46 - Gi_March2020
P. 46

igem news



                                                                                    TECHNICAL STANDARDS
                   TECHNICAL  Standards and updates from the IGEM Technical Services team
                                                                                    STANDARDS RECENTLY   DRAFTS FOR COMMENT
                                                                                    PUBLISHED      IGEM/G/8 Handling,
                                                                                                   transport and storage
                                                                                    IGEM/GM/4
                 YOUR QUESTIONS ANSWERED                                            Flowmetering   of PE pipe and fittings
                                                                                    practices (>38bar and
                                                                                                   IGEM/GL/10 Gas
                                                                                    <100bar)
                                                                                    IGEM/PRS/40 Medium   quality standard
                 OUR IGEM EXPERTS ANSWER YOUR COMMON TECHNICAL QUESTIONS            pressure meter   IGEM/IG/1 Standards
                                                                                                   of training in gas work
                                                                                    installation kits
                                                                                    IGEM/PRS/41 Low   IGEM/UP/9
                                                                                    pressure meter   Application of
                                                                                    installation kits  natural gas and fuel
                                                                                                   oil systems to gas
                                                                                    IGEM/GM/PRS/50   turbines
                                                                                    Meter serial
                                                                                    numbering      DRAFTS AFTER COMMENT
                                                                                                   IGEM/UP/21 Liquefied
                                                                                    IGEM/UP/16     natural gas fuelling
                                                                                    Design for natural   stations
                                                                                    gas installations
                                                                                    on industrial and   IGEM/TD/4 PE and
                                                                                    commercial premises   steel gas services and
                                                                                    with respect to DSEAR  service pipework
                                                                                    IGEM/TD/16     IGEM/TD/12 Pipework
                                                                                    Biomethane injection  stress analysis for gas
                                                                                                   industry plant
                                                                                    IGEM/TD/19
                                                                                    Reinforced     IGEM/TD/13
                                                                                    thermoplastic   Pressure regulating
                                                                                    pipelines for high   installations
                                                                                    pressure gas   IGEM/G/5 Gas in
                                                                                    transmission   multi-occupancy
                                                                                    IGEM/SR/18 Safe   buildings
                                                                                    working practices to   IGEM/GM/6 Non-
                                                                                    ensure the integrity   domestic meter
                                                                                    of gas assets   installations –
                                                                                    and associated   standard designs
                                                                                    installations
                                                                                    IGEM/SR/29 Dealing
                                                                                    with gas escapes


                                                                                   that the pipeline has been internally
                                                                                   contaminated with debris should be
                                                                                   carried out before deciding whether a
                 Q: WHAT IS PIGGING AND            pigs are used to gather information on   pigging operation would be beneficial.
                 WHEN IS IT USED?                  the condition of the pipeline and the   In the case where a hydrostatic test
                 A: When a pipeline is used over a   gravity/location of any fault or problem  has taken place, the use of a pigging
                 period of time, the need for cleaning     Special duty pigs are used for special   operation is essential to remove the
                 and inspection arises. Build-up   purposes, for example for isolating   water and dry out the internal bore of
                 of debris in a pipeline can lead to   a section of a pipeline. Examples   the pipeline.
                 transmittal slows and undetected   include plugs.
                 cracks and pipeline flaws can prove   Pigs are launched by pig traps,   Q: IF YES, IS THE INITIAL TEST OF
                 hazardous. For safety reasons, there   types of which include: valve type   350MBAR REFERENCED IN IGEM/
                 has to be a way of ensuring continuous   pig launchers, vertical multiple pig   TD/3 EDITION 5 APPLICABLE
                 integrity of a pipeline and fluid flow.   launchers, automatic sphere launchers   PRIOR TO PIGGING OPERATIONS
                 Pigs have been used for these purposes.   and automatic multiple pig launchers.   ASSOCIATED WITH PNEUMATIC
                 Specialised pigs have been developed   Pigging is referenced in a number of   TESTS?
                 for different applications and they fall   IGEM standards, including IGEM/TD/3   A: Yes
                 into different categories:       Edition 5 Steel and polyethylene (PE)
                    Utility pigs                                pipelines for gas   Q: WHAT IS THE RATIONALE FOR
                  are used for                                   distribution.     THE INITIAL 350MBAR TEST?
                  cleaning                                                         A: An initial test of 350mbar is
                  pipelines to                                   Q: IS PIGGING     carried out to ensure the integrity of
                  improve flow                                   USED IN           the pipeline and that the pipe is not
                  efficiency,                                    ASSOCIATION       completely blocked at any point before
                  separating                                    WITH PNEUMATIC     applying the driving pressure required
                  products in-line,                            TESTING AS WELL?    to push the pig through the pipeline.
                  dewatering                                   A: It can be, but   A pigging operation would be fruitless
                  pipelines, etc.                              is generally not    if the pipeline failed the initial test,
                    Inline inspection                          necessary. An       so the failure must be identified and
                  pigs or intelligent                          assessment of the risk   rectified first.



          46



                                                                                                                  13/02/2020   13:36
        IGEMNews_TSU.indd   1                                                                                     13/02/2020   13:36
        IGEMNews_TSU.indd   1
   41   42   43   44   45   46   47   48   49   50   51