IGEM NEWS | Young Persons Paper Competition 2018

                 MOTHER NATURE DOESN’T



                 SIGN EASEMENTS




                 By Matthew Goode, Network Supervisor O&M Projects at Cadent,
                 Young Persons Paper Competition 2018 first runner-up



                                hen faced with
                                serious river bank
                                erosion that
                                threatens the
                                integrity of an asset,
                 Wyou have to
                 intervene, either by removing the
                 asset or removing the threat.
                   Threatening the supply of 250,000
                 properties in the Manchester area is
                 the River Mersey. The flowing river is
                 clawing away at the bank, which
                 houses the Partington-to-Stockport
                 18in steel gas main, operating at 32bar
                 on the boundary between Stockport
                 and Manchester councils.
                   As a gas engineering company, facing
                 an environmental engineering problem
                 is not our everyday business. With
                 guidance from specialist contractors, I
                 decided to divert the River Mersey
                 back to its 1967 channel to protect the
                 pipeline, utilising soft engineering
                 techniques to ensure that it stays there
                 for the foreseeable future.
                   In conjunction with Northern Divers
                 and Cain Bioengineering, I am re-
                 commissioning this channel on the
                 inside bend and rebuilding the outside   The River Mersey
                 bank. Following a topographical survey
                 of the river, our bioengineering   gradually getting closer to the river   the boundary between Stockport
                 consultants have created an all-  edge. On closer inspection, it was   Council and Manchester Council.
                 inclusive solution to protect our assets,   identified that the river’s course was   In order to prevent further erosion
                 preventing erosion from simply moving   changing and eroding at an alarming   and take proactive protection of the
                 up or downstream. The designs include   rate, therefore reducing the amount of   pipeline, I have contracted Northern
                 shallower river banks, an attenuation   protection for our asset.  Divers to act as main works
                 riffle and stabilised banks. The project   The Partington-to-Stockport pipeline   contractor, including principal
                 started in spring 2018 and is due for   was laid in 1967. At this time, the river   contractor and principal designer
                 completion this autumn.          was approximately 30m away from   under Construction (Design &
                                                  the pipeline, not imposing a risk. At   Management) Regulations (CDM).
                 BACKGROUND                       the time of writing, there is less than   Due to the complexity of the works
                 Cadent owns and operates over    5m of bank between the river and   and the nature of this river, Northern
                 131,000km of gas mains within its four  pipe, which is getting smaller and   Divers has brought in the help of Cain
                 networks, delivering gas safely and   smaller every day.          Bioengineering, which has over 40
                 securely to approximately 11 million   Figure 2 shows an overview of the   years of experience in river works,
                 customers. Our high pressure     area. The Cadent pipeline is laid   hydrology and fluvial dynamics.
                 pipelines are regularly monitored via   amongst other physical and
                 aerial and local methods to ensure   stakeholder challenges such as   THE PROBLEM
                 that our easements are being adhered   National Grid pylons, the Waterside   The River Mersey and its tributaries
                 to and that Mother Nature is not   Hotel and Network Rail assets. Just   have a huge catchment area,
                 encroaching on our assets.       upstream is the start of the River   extending east of Manchester and to
                   During cyclical inspection, our   Mersey, which is the confluence of   the Peak District. In order to ascertain
                 pipeline inspectors noticed that the   two rivers – the Tame and the Goyt.   an understanding of the extent of the
                 Partington-to-Stockport pipeline was   Historically, the river was chosen as   erosion, remediation works and costs,