Hydrogen for net zero
                             future
                                                  Our ambition is to make hydrogen a safe, fair and reliable choice for consumers.
                                                  The delivery of Net Zero by 2050 requires an unprecedented amount of change,
                                                  investment and collaboration. As the UK’s largest distributor of natural gas
                                                  to 11 million homes, we are focused on what we can do to move away from
                                                  fossil fuels to other kinds of low carbon energy such as hydrogen in a way
                                                  that protects consumers and creates high-quality jobs.
 10                                               – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – –
                                                                        Hydrogen will play an important role as an energy source for industry,
                                                                        transport, power generation and heating buildings and homes, but
                                                                        we need to act now. In the words of the Business Secretary, we must
                                                                        ‘seize the opportunity’ to be a global leader in the future $2.5tr hydrogen
                                                                        economy, to create thousands of high-quality jobs across the supply chain,
                                                                        strengthen energy security and capitalise on our innovation and expertise.
                                                                        We are committed to working with Government, local authorities,
 Hydrogen
                                                                        industry partners and consumer groups to maximise this
                                                                                                   igem news – yppc
                                                                        decarbonisation and economic opportunity. Our Hydrogen Ten
                                                                        Point Plan outlines our long-term commitment to decarbonise
 Ten Point Plan                                   Steve Fraser          homes and businesses in a way that minimises the impact on
                                                                        the consumer, whilst also creating jobs across the UK.
                                                  Chief Executive Officer
                 and enthusiasm towards Cadent’s green
                                                  FIGURE 1 CADENT 10 POINT HYDROGEN PLAN (PUBLISHED IN OCTOBER 2021)
                 power trial, as it mirrors their own
                 green development ambitions.
                   The initial scope given to the
                 graduate team was to find a solution
                 that could provide a base load of 30-
                 60kW, for a period of around 20 weeks.
                 Potential solutions              Preparing and scaling   Scaling investment    Looking after our
                 Immediately, the team set out to   hydrogen production  in jobs and skills  colleagues and consumers
                 investigate different green alternatives   1           5                    8
                 to diesel gensets currently available on   Introduce net zero    Launch a Hydrogen Skills   Provide finance for low carbon
                 the market.                      construction sites from 2023  Academy by 2024  heating for our employees now
                 Two viable options were found:   2                     6                    9
                 a.)  HVO (hydrotreated vegetable oil)   Deliver the first scaled hydrogen   Develop a hydrogen education   Publish plans to demonstrate
                                                  blending facility from 2025
                   HVO is a form of biodiesel – a widely   3            programme by 2024    heat decarbonisation of whole
                                                                        7
                                                                                             communities by 2025
                   known drop-in alternative liquid                                          10
                                                  Deliver the UK’s first 100%   Put pace into the adoption of
                   fuel to fossil diesel. As the fuel is   hydrogen pipeline by 2027  hydrogen vehicles from 2025  Install hydrogen-ready
                   sourced from degraded crops, which  4                                     appliances by 2026 or sooner
                   have absorbed carbon dioxide from   Enable 5GW of hydrogen
                   the atmosphere throughout their   production in our region
                                                  by 2030
                   growth, it has less associated carbon
                   emissions than standard diesel.
                   However, the same harmful gases   FIGURE 2 TYPICAL DIESEL GENERATOR IN OPERATION
                   are released at the point of use from
                   the generator itself, and audibility is
                   unchanged⁴.
                 b.)  Hydrogen fuel cells PEM (polymer
                   electrolyte membrane) fuel cells
                   recombine hydrogen and oxygen,
                   at high temperature and pressure,
                   in an electrochemical reaction,
                   to produce three simple outputs:
                   water, heat, and electricity⁵. The
                   market for this particular application
                   is still relatively small, but it is
                   now developing at a rapid scale
                   in parallel with the rest of the
                   hydrogen industry. If the hydrogen
                   fuel is sourced by ‘green’ means –
                   i.e., electrolysis (separating water
                   into hydrogen and oxygen using
                   renewable electricity) – then the only
                   possible net emission associated   Chosen solution              Deployment day
                   with the whole hydrogen lifecycle   After considering both options, the   The 250kVA fuel cell unit was
                   is potentially the transport of the   group targeted hydrogen fuel cells as   successfully deployed on site on 24
                   hydrogen fuel itself from source-  the whole purpose of the Cadent trial   June. It was a proud moment for the
                   to-site, for example if carried out   was to be bold and to investigate a truly   Cadent group after eight and half
                   via diesel-powered HGVs. Another   green solution that the gas distribution   months of planning. This is believed to
                   benefit, often overlooked, is how   industry is largely unfamiliar with.   be a first-use case by a UK-based GDN
                   quietly (~65 dB) these fuel cell units   Therefore, various suppliers of large-  of hydrogen fuel cell technology. In
                   operate in comparison to their diesel   scale hydrogen fuel cells were evaluated   addition to powering the welfare cabins,
                   counterparts (~90 dB). This means   before a decision was made to proceed   two 22kW EV chargers were connected
                   that the range of operating hours   with GeoPura Ltd⁶.          to the unit, further utilising the fuel
                   of construction sites utilising such                            cell’s electrical output and expanding
                   units can be extended, especially   Project delivery            the portfolio of ‘green systems’ on site.
                   in urban areas – therefore overall   The Cadent group arranged all site
                   project timelines can be compressed   logistics and engaged with all relevant   Results
                   as a result. However, currently   stakeholders to ensure, in advance,   The trial ended on 1 November after
                   the capital cost of manufacturing   that despite the change of power   19.5 weeks of operation. Over this time,
                   fuel cell devices is high, and the   supply system and storage of hydrogen   1,255kg of green hydrogen was used
                   operating costs to produce hydrogen,   gas on-site, industrial standards and   to provide clean power to the site with
                   especially green hydrogen, are also   regulations were still being met. Above   water as the only by product.
                   high. This solution is therefore   all else, it was necessary to ensure the
                   understandably more expensive   site would remain safe and without   Environmental savings
                   than conventional alternatives.   power interruptions.          Using an assumption given by the