2. GENERAL PERFORMANCE
2.1 GENERAL PERFORMANCE PARAMETERS
Achieved
22-23
S. No Description 22-23
Target
(up to Oct-22)
Accidents on Elect loco/Crew
A/C
1 (a)Collisions Nil Nil
(b)Derailments Nil Nil
(c)SPAD Nil Nil
2 Stallings on account of crew Nil Nil
Loss of punctuality of trains due
3 Nil Nil
to crew mismanagement
4 9 Hrs rule Wheel -
implementation Movement 86.3
in % CMS 60 59.7
5 SEC (Goods) / Month (Aug’22) 3.30
3.68
SFC (Goods) (Aug’22) 2.00 2.71
Pre-Arrival Detention in Minutes
6 (Avg on Divn) excluding Zonal 15’’ 20.1
interchange point.
Periodical rest @ 30 hrs given to
7 4
running staff 4.0
CMS booking in fetch as per
8 100 96.2
rule (%)
9 Energy feeding in CMS (%) 100 94.6
10 % of Utilization of running hrs 90 95.6
No. of trip inspections of Locos
11 300 290
in Trip Sheds
12 Electric Loco failures 162 130
13 Diesel Loco failures 57 44