Page 99 - booklet draft
P. 99
b). ACTION PLAN ITEMS (AC & TL)
(i) Action Plan:
S. 2022-23
No Description of items 2020-21 2021-22 (upto Oct.-22)
1 Punctuality loss cases on TL&AC account (owner ship basis)
AC coaches 6 3 14
TL coaches 0 1 0
2 CNAC 0 0 0
3 Training of staff - Supervisors 3 14 0
4 Training of staff - Technicians 356 149 216
5 No. of Seminars/workshops 28 36 23
6 In effective percentage
AC coaches 0.20 0.33 0.33
TL coaches 0.015 0.025 0.024
7 Sick Marking incidences
AC coaches 214 440 376
TL coaches 41 46 43
8 V-Belts failures – No. of incidences
AC coaches – (No. of sets) 10 26 19
TL coaches - (No. of sets) 25 24 28
9 Battery failures
AC Battery 68 62 39
TL Battery 79 84 19
10 Scrap details (in MT)
Ferrous 40.06 11.26
Non-Ferrous 4.76 3.48
11 Provision of Test benches
HOG test-kit for testing IV/UIC
coupler continuity test -- 1 --
MMR calibration test -- 1 0
Micro Controller simulation kit -- 0 0