ASSISTANCE REQUIRED:
No. of Adminis
No. of
Total posts trative
Sl. posts
No Section leng propo sanctio approv Remarks
th ned by al of
sed
HQrs DRM/SC
1. Sent to CPO/SCR on
21.05.12 for obtaining
Creation of Posts for 69 20
1 JPTN-MACU-VNUP Kms posts -- -- FA & CAO
concurrence.
(JPTN, RRPM & MACU)
2. CSTE/SCR has
approved for 18 posts.
Creation of Posts for
Mattampalli- 1. Vetted for 22 posts
Janapahad 18 26 by DFM/SC.
2 (Mattampalli, Kms posts -- -- 2. Sent to CPO/SCR on
22.02.17 for obtaining
Raghapuram, FA & CAO
Janapahad&Vishnupur concurrence.
am (addl) )
Creation of posts for 1. 17 posts vetting
New third line work, done by DFM/SC.
RGPM-MMZ. 33.4 23 2. Sent to CPO/SCR on
3 -- --
(Raghavapuram- Kms posts 22.02.17 for obtaining
MandamariExclPedda FA & CAO
mpet-Manichiryal) concurrence.
Creation of Posts in 1. 52 Posts Vetting
connection with provision done by DFM/SC
of MMTS Phase-II work 35.5 57 2. Sent to CPO/SCR on
4 -- --
between TLPR-RCPH & Kms posts 08.06.18 for obtaining
MLY’C’ Cabin-CHZ-GT FA & CAO
Sec. concurrence.
New BG Non-electrified
single line between Out of 53, 24 posts
PDPL-NZB (for the have been
stations KRTL,MTPI, sanctioned.
As the section is an
5 MRTD ARMR) 53 24 -- important section, the
New BG Non electrified posts posts remaining technical
single line between PDPL- posts may also be got
NZB (for the stations sanctioned please.
GDRA, LPJL, Podur, Mallial File with Sr. DPO/SC
and Nukapalli)
Creation of Additional 119 Sent to PCPO vide lr.
6 -- --
Posts in connection of Posts No. SCR/P/SC/N/