Page 71 - booklet draft
P. 71
PTKP-RGPM third line 10/210(a)/ S&T/
cadre dt 23.7.2021
Sent to PCPO vide
Creation of additional
7 posts in connection of 18 89 -- -- lr.no SCR/P/SC/
MAGH-WIRR third line. Km Posts N/10/210(a)/ S&T/
cadre dt 23.7.2021
Creation of additional
posts in connection of Sent to PCPO vide
Pocharam (PCZ)- MTMI 51 lr.no
8 -- -- SCR/P/SC/N/10/210(
BP cabin, Raghapuram Posts a)/ S&T/cadre dt
new crossing 23.7.2021
station/cabin
Creation of additional
posts in connection of
BDCR-Sattupalli new
line (New stations 31 Sent to Sr DFM on
9 Koyagudam, Posts -- -- 16.11.2021.
Chandragonda,
Bhavanapalem and
increased assets at
BDCR BP cabin stns)
Creation of additional
posts in connection of 20 41 Sent to Sr.DPO/SC
10 -- --
BGSF-OPL Third line Km Posts on 27.11.2022
section