Page 29 - AFAP Success Stories 2020
P. 29

Country      Port                       Transport/border transit    Access/Availability
              Mozambique Normal operations, with      Movement of goods by        Retail shops are operating in
                           restrictions in place on   duly accredited operators is   normal way from 7am to 5pm
                           unloading loose bags less   permitted. CFM rehabilitating   No expected shortage
                           than 500kgs from 15 July to   Beira/Machipanda railway
                           increase movement of cargo.   to increase the capacity and
                           Restriction in working hours,   improve the safety of traffic
                           with increased congestion   on the Beira corridor. Normal
                           and demurrage. Mandatory   operations at border crossings
                           screening of the ship crews.
                           Rehabilitation of the port
                           warehouses that were severely
                           damaged by the cyclone
                           Idai in 2019. Restriction at
                           wharf (Shorter working hours,
                           restrictions on discharging
                           some product type)  causing
                           minor delays

              Rwanda       Imports through Mombasa and   Normal operations. Normal   Normal trading.
                           Dar es Salaam ports        movement of transit goods at   No expected shortage
                                                      the border
              South Africa  Normal operations         Normal operations slight delays   Off season. Limited trading
                                                      at border crossings due to   No expected shortage
                                                      screening. Beitbridge Border
                                                      Post reopened after temporary
                                                      closure
             Tanzania     Normal operations. Shipping   Normal operations         Normal trading
                          lines urged to extend the                               No expected shortage
                          demurrage free period by
                          between 10 and 25 days on
                          different destinations, giving
                          Dar es Salaam port an edge over
                          Mombasa port, Kenya