Page 3 - Demo
P. 3

2.10/2a
REV 25
A330
CHINA AIRLINES
REV 25
PAGE 2a
GENERAL
SCOPE
The QRH contains some specific procedures which are not displayed on ECAM.
As a general rule, the procedures displayed on ECAM are not provided in the QRH.
For all abnormal procedures the task sharing is as follows : PF – Pilot flying – Responsible for :
! Thrust levers
! Flight path and airspeed control
! Aircraft configuration (Request configuration change)
! Navigation
! Communications
PM – Pilot Monitoring – Responsible for :
TASK SHARING FOR ABN PROC
! ! !
Monitoring and reading aloud the ECAM and checklists
Performing required actions or actions requested by the PF, if applicable
Monitoring action (with consent of PF) 1. Thrust levers (performed by PF)
2. ENG master switches
3. FIRE Pb-Switches
4. IDG disconnect P/B’s 5. ADIRS mode selectors 6. All guarded switches 7. Reset buttons
Note: For abnormal procedures with specific duty assignments, performed accordingly.
DO NOT CLEAR ECAM WITHOUT CROSS-CONFIRMATION OF BOTH PILOTS.
Procedures are initiated on pilot flying command.
No action will be taken (apart from audio warning cancel through MASTER WARN light) until :
! The appropriate flight path is stabilized, and
! The aircraft is at least 400 ft above the runway, if a failure
occurs during takeoff, approach, or go-around. (In some emergency cases, provided the appropriate flight path is established, the pilot flying may initiate actions before this height).
The flight crew can stop the procedure if the conditions for the application of the QRH procedure disappear.
Normal C/L are initiated by the PF and read by the PM. The PF shall respond after having checked the existing configuration. When both pilots have to respond, “BOTH” is indicated.
ECAM CLEAR
ABN / EMER PROC INITIATION
NORMAL CHECK LIST


































































































   1   2   3   4   5