Page 40 - Swale AQMA Feasibility Study April 2020_
P. 40

AQMA Feasibility Assessment
               A2 – Keycol Hill and Key Street, Swale

                        Table B.2: Monitored and Adjusted Modelled Total NO2 at Roadside
                        Monitoring Sites (2018)


                                                                  -3
                                                Concentrations (μg.m )
                         Monitor   Type
                            ID
                                         Monitored   Modelled    % Difference

                           ZW6      A       29.1        29.5        1.5%

                           SW20     DT      26.1        28.5        9.2%

                           SW37     DT      33.7        38.1        13.1%

                           SW38     DT      31.1        29.3        -5.9%


                           SW45     DT      39.7        44.5        12.0%

                           SW62     DT      33.7        34.6        2.7%

                           SW66     DT      35.4        26.9       -24.1%

                          SW111     DT      40.9        33.9       -17.1%

                          SW112     DT      35.4        32.6        -8.0%


                          SW113     DT      69.3        69.3       -0.03%
                        Note:  DT = Diffusion Tube; A = Automatic Monitor









































                                                   Figures and Appendices
   35   36   37   38   39   40   41