Page 3 - Wanzek Construction, Inc. Proposal — Cedar Creek Wind Project
P. 3

  OPTION 2:
Included:
• Prepare soil (tilling soil)
• Add soil amenities
• Add wetting agent
• Seed - high rate of seed lbs/acre
• Pre-germinate of percentage of the seed • Hydroseeder applied
• Drag and/or pack seed
• Warranty of vegetative establishment. Does not
include high erosion areas due to high flow of water.
Exclusions:
• Water - Wanzek must supply water
Optional items:
• Erosion blanket/high erosion areas due to high flow of water (bottom of ditches, concentrated flow areas).
Negotiated
$3300/acre for estimated 396 acres
Total: $1,306,800
            

















































































   1   2   3   4   5