Page 23 - Simplified Wastewater Treatment Fundementals\Package Plants
P. 23

Package Plants






                           The diligent Operator must be aware of following Package Plant conditions:

                                  ✓ Know Your Flow Rate Throughout the Day

                                  ✓ Is the flow rate low, average or high?

                                  ✓ How much is the influent flow rate surging during the peak flow period?

                                  ✓ Is the flow surge pushing primary sludge over the weirs?




                           Observe the Aeration Tank Surface


                                  ✓ Is the scum box clear?

                                  ✓ As you walk along the catwalk do you see diffusor dead spots or blow outs?




                           Observe the Settling Tank Surface

                                  ✓ What is the target blanket depth?


                                  ✓ How is the blanket depth trending from day to day?

                                  ✓ Do you see any gasification on the surface?
   18   19   20   21   22   23   24   25   26   27   28