Page 19 - SIMPLIFIED WASTEWATER TREATMENT FUNDAMENTALS\ Advanced Activated Sludge P3
P. 19
Aeration Contact Time
Winter Season Contact Time Example
In the middle of the winter season, this northern wastewater facility’s wastewater temperatures are
approaching 8 C (46 F). Under these extreme conditions of slow cellular metabolisms, Process Control
dictates a need of at least 6 hours of Contact Time to adsorb enough food before leaving the Aeration
Basin to settle and absorb (or ingest food) within the Secondary Clarifier.
Factors:
Flow 0.8 MGD (combined Influent Flow + RAS Flow) Aeration Basin Volume 430,100 gallons
Detention Time Formula
Volume MG x 24 Hours = Hours Volume 0.4301 MG x 24 Hours = 12.9 Hours
Flow MGD Combined Inf + RAS Flow 0.8 MGD
Under this low flow winter season scenario, the Aeration Basin is easily meeting the 6-hour process target.