Page 5 - Presentation
P. 5
18. Radial platform in tank dykes for mixer replacement
(Crude Tanks)
19. Colour coding and stenciling of pipelines
20. Fire water sprinkler system.
21. Earthing & Bypass conductors
22. Gas Detectors
23. Radar Gauges
24. MOVs
25. Liquidation of Annual external inspection
recommendations
26. Hand rails in walk way
27. Tank Data
28. Insulation renewal of pipelines
29. Pointing of precast slabs in crude dykes & Concreting
for earthern dykes
30. Mounded Bullets.
31. Oil in storm water canal
32. Flare Header Painting
33. Earth Removal from Ref-II flare area
34. Reconciliation of materials